Tafadzwa Nyikadzino
The Zambezi River Authority (ZRA) has approved a reduced combined water allocation of 23 Billion Cubic Metres (BCM) for power generation at Kariba for 2027, down from 36 BCM in 2026, citing forecasts of strong El Niño conditions and below-normal rainfall.
The allocation, to be shared equally between ZESCO Limited and the Zimbabwe Power Company (ZPC) with 11.5 BCM each, was announced on Tuesday, 14 October 2026.
In a statement, ZRA said the decision was based on the latest regional rainfall outlook issued by the Thirty-Third Southern Africa Regional Climate Outlook Forum (SARCOF-33) held in Swakopmund, Namibia from 25th to 28th August 2026, downscaled forecasts from the national meteorological agencies in Zambia and Zimbabwe, and the Authority’s internal inflow projections.
SARCOF-33 indicated an increased likelihood of below-normal rainfall across much of the central and southern parts of the SADC region, linked to El Niño conditions that have developed in the tropical Pacific and are expected to strengthen. For southern Zambia and much of Zimbabwe, below-normal rainfall is expected during the early part of the season, with the same likely to extend across most areas of both countries from January to March 2027.
By 31 December 2027, the reduced utilisation is projected to result in a closing lake level of 476.80 metres, with 5.83 BCM of usable water remaining, equivalent to 9% live storage.
2026 Allocation Unchanged
ZRA said the revised 2026 combined water allocation for power generation remains unchanged at 36 BCM, following an increase from 30 BCM, supported by substantial inflows received during the 2025/2026 rainfall season which improved water availability.
The allocation is shared equally, with 18 BCM assigned to each utility.
As of 14th October 2026, the balances for the remainder of 2026 were as follows:
ZESCO’s Kariba North Bank Power Station: 3.53 BCM balance on 18 BCM allocation, representing 19.66% balance remaining.
ZPC’s Kariba South Bank Power Station:6.13 BCM balance on 18 BCM allocation, representing 34.09% balance remaining.
By 31st December 2026, the lake is projected to close the year with 16.24 BCM of usable water, equivalent to 25.10% live storage which will be available at the beginning of 2027.
Improved Current Levels
As of 14th October 2026, Lake Kariba stood at 480.65 metres above sea level and held 23.77 BCM of usable water, representing 36.68% of usable storage capacity. This is a substantial improvement from the same date in 2025 when the lake level was 477.34 metres and usable water stood at 8.25 BCM, or 12.75% of usable storage.
ZRA said it has continued to monitor water utilisation on a daily basis and to coordinate with the Utilities through joint technical committee meetings to support compliance and enable timely responses to changing hydrological conditions.
“The Authority recognises the importance of Lake Kariba in so far as electricity supply and economic activity in both Contracting States are concerned. Consequently, the Authority will continue to manage the shared water resource diligently,” ZRA said.